Dunkirk Q95M-200 Installation Manual

Browse online or download Installation Manual for Water heaters & boilers Dunkirk Q95M-200. Dunkirk Q95M-200 Installation manual User Manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - MAINTANANCE MANUAL

DUNKIRK BOILERS85 Middle Rd.Dunkirk, NY 14048www.dunkirk.com P/N 240006103D, Rev.C [04/2009]RAn ISO 9001-2000 Certified CompanyQ95M-200GAS-FIRED DIREC

Page 2 - I  INTRODUCTION

V  BEFORE INSTALLING THE BOILER! WARNINGe boiler must be located on a surface that can support the weight of the installed boiler.e boiler should

Page 3

VII  NEAR BOILER PIPINGPressure Relief Valve / Temperature Pressure Gaugee boiler is furnished with a relief valve in the boiler parts bag. Pro-vide

Page 4

VII  NEAR BOILER PIPINGExcess water should go through the overow and out through 2. the condensate drain line. Verify proper operation of the drain

Page 5 - 1 through 4

VIII  COMBUSTION AIR AND VENT PIPEshould be taken to prevent building materials at the vent from being damaged by exhaust of ue gas.e venting syste

Page 6 - SEPARATION

VIII  COMBUSTION AIR AND VENT PIPEWhile cement is still wet, insert pipe into socket with a ¼ turn 8. twist. Be sure pipe is fully inserted into tti

Page 7 - COMBUSTION AIR

Figure 9 - Gas Piping1/2” GAS CONNECTION*NOTE: 3/4” GAS SUPPLYTO BOILER JACKETREQUIRED TO FEEDTHE BOILER.e boiler is equipped with a ½” NPT connectio

Page 8 - 12" OR MORE CLEARANCE

Route all wires and conduits to the openings in the right jacket 5. panel.Line Voltage Monitoris boiler is factory equipped with a line voltage monit

Page 9 - 3” Diameter PVC Vent/Exhaust

XI  CONTROLS AND ACCESSORIESis section provides a brief description of the key controls and accessories found in this boiler. See the Repair

Page 10

XI  CONTROLS AND ACCESSORIEScondition. e LWCO senses water through a probe at the top of the boiler that sends a signal through the water to ground.

Page 11 - VII  NEAR BOILER PIPING

Air Proving Blocked Vent Safety Assemblye air proving blocked vent safety assembly incorporates two pressure switches that are designed to discontinu

Page 12 - TABLE #4

Table of ContentsGASFIRED DIRECT VENT MODULATING HOT WATER BOILERInstallation Manual Printed in USA • Made In USAHI - Introduction ...

Page 13

XII  WATER TREATMENT & FREEZE PROTECTIONleak will become obvious if boiler pressure decreases when make up valve is closed.All system leaks must

Page 14 - Natural Gas

XII  WATER TREATMENT & FREEZE PROTECTIONRecommended Aluminum Antifreeze& Inhibitor SuppliersRecommended ProductsInterstate Chemical2797 Free

Page 15 - THE BOILER

Filling boiler with water and purging airFor each of the following systems, refer to the appropriate piping diagrams in the Installation ManualSystems

Page 16

Control Valve “OFF”Control Valve “ON”XIII  PUTTING THE BOILER IN OPERATIONTO TURN OFF GAS TO APPLIANCESet the thermostat to the lowest setting.1. Tur

Page 17

and Freeze Protection section of manual 240006104.Check that boiler area is free from combustible materials, gaso-2. line, and other ammable vapors a

Page 18

ened sediment using a shop vacuum with a snorkel attach-ment.Inspect burner for any foreign matter in the ame ports or •inside the burner. Any foreig

Page 20

XV  BOILER WIRING DIAGRAMCOMPONENT CODING (CODE DES COMPOSANTES)NOTE:WIRING (CÂBLAGE)LINE VOLTAGE BY FACTORY / LIGNE DE VOLTAGE PAR L'USINELOW V

Page 21

XVI  PIPING AND WIRING APPENDIXCH C1L1T-STATL2CH C2DHW C2DHW C1DHW T2A2A1DHW T1CH T2CH T1OUTDOORAIR SENSORBOILER CONTROL PANELDHW CIRCL1120 V

Page 22

BOILERDHW CIRCULATORCH CIRCULATORPRIORITY ZONECIRCULATOREXPANSIONTANKWATER INLETFLOW CONTROLV AV L ESHUT-OFFV A L V EPRESSUREREDUCER VALVECHECK VALVEB

Page 23 - XIV MAINTENANCE AND CLEANING

III  RULES FOR SAFE INSTALLATION AND OPERATIONII  SAFETY SYMBOLS AND WARNINGS! WARNINGis appliance has been equipped for residential instal-lation

Page 24

ZONE 3ZONE 2ZONE 1 (PRIORITY ZONE)BOILERWATER INLETCH & DHWSYSTEMCIRCULATOR*USE FULL PORT ZONE VALVE. FOR OPTIMUM TANK PERFORMANCE, CONSIDER USIN

Page 25

XVI  PIPING AND WIRING APPENDIX23DO NOT USE1REDBLACKBLACKREDand 4 whenvalvesusing zonewithout anend switch.Note: Installwire jumperbetweenterminals 3

Page 26

XVI  PIPING AND WIRING APPENDIXZONE 3ZONE 2ZONE 1 (PRIORITY ZONE)BOILERWATER INLETZONE 4*USE FULL PORT ZONE VALVE. DHWCIRCULATORCHCIRCULATORCIRCULAT

Page 27 - XV  BOILER WIRING DIAGRAM

XVI  PIPING AND WIRING APPENDIX23DO NOT USE1REDBLACKBLACKREDand 4 whenvalvesusing zonewithout anend switch.Note: Installwire jumperbetweenterminals 3

Page 28

ZONE 3ZONE 2ZONE 1 (PRIORITY ZONE)BOILERZONE 4DHW CIRCULATORWATER INLETCIRC 2CIRC 3CIRC 4CIRCULATORSHUT-OFFVALVEPRESSUREREDUCER VALVECHECK VALVEBALL V

Page 29 - AR822-II

COMMONZONE MODULETO EXTRA24 VAC@ 1VAPRIORITY ONHotline indirect water heaterZR-ZCCONTROL WITHPRIORITY120V ACL2 NL1 (HOT)ISOLATEDCH C1L1SWITCHX X

Page 30

XVI  PIPING AND WIRING APPENDIXBOILERPRIMARYPUMP(CH & DHW)ZONE 1 (PRIORITY ZONE)ZONE 2ZONE 3ALTERNATE PUMPLOCATION12" MAX APART(TO PREVENT F

Page 31 - N L N L N L ZR ZC

XVI  PIPING AND WIRING APPENDIX120V ACL2 NL1 (HOT)BOILER CIRC (WILL RUN FOR ALL CHAND DHW CALLS FOR HEAT)ELECTRONIC FUSEVACCIRCUIT ONL2120NO4NC

Page 32

XVI  PIPING AND WIRING APPENDIXZONE 3ZONE 2ZONE 1 (PRIORITY ZONE)SYSTEMCIRCULATOR(TO PREVENT FORCEDFLOW IN SECONDARY)12" MAX APARTBOILERBOILERCI

Page 33

23DO NOT USE1REDBLACKBLACKREDand 4 whenvalvesusing zonewithout anend switch.Note: Installwire jumperbetweenterminals 3120 VACT-STATENDSWITCHMOTOR*BOIL

Page 34

IV  BOILER RATINGS AND CAPACITIESTABLE 1: SEA LEVEL RATINGS - NATURAL AND PROPANE GASESBoiler Input Rate (MBH)(1)Heating Capacity (MBH)(1)(2)Net I=B=

Page 35 - DHW CIRC

XVI  PIPING AND WIRING APPENDIXZONE 3ZONE 2ZONE 1 (PRIORITY ZONE)(TO PREVENT FORCEDFLOW IN SECONDARY)12" MAX APARTPRIMARYPUMPBOILERALTERNATEPRIM

Page 36 - Piping Diagram 5

23DO NOT USE1REDBLACKBLACKREDand 4 whenvalvesusing zonewithout anend switch.Note: Installwire jumperbetweenterminals 3120 VACT-STATENDSWITCHMOTOR*BOIL

Page 37

XVI  PIPING AND WIRING APPENDIXBOILERWATER INLETALTERNATECIRCULATORLOCATIONTO SYSTEMFROM SYSTEMCIRCULATORSHUT-OFFVALV EPRESSUREREDUCER VALVECHECK VAL

Page 38

XVI  PIPING AND WIRING APPENDIXBOILERALTERNATECIRCULATORLOCATIONTO SYSTEMFROM SYSTEMCIRCULATORWATER INLETSHUT-OFFVA LV EPRESSUREREDUCER VALVECHECK VA

Page 39 - SWITCH LEGEND

XVI  PIPING AND WIRING APPENDIXTRANSFORMER24VAC 40 VABlackWhiteYellowYellowDHW C1DHW C2CH C2CH C1A2DWH T1DHW T2A1BOILER CONTROL PANELCH T1CH T2L1L21

Page 42

NOTES

Page 43

Date Service Performed Company Name & Tech Initials Company Address & Phone #

Page 44 - TRANSFORMER

V  BEFORE INSTALLING THE BOILERless than seven (7) feet above nished grade in the area of the vent-ing including but not limited to, decks and porch

Page 45

V  BEFORE INSTALLING THE BOILERe clearances shown in 4. Table 3 indicate required clearances per CSA listing. A minimum 1” clearance must be mainta

Page 46

V  BEFORE INSTALLING THE BOILERIf the concentric vent termination is being used, refer to Figure 3 for proper setup.NOTE: IF THERE IS A POTENTIAL FOR

Page 47

V  BEFORE INSTALLING THE BOILEROVERHANG12" MINIMUM90°VENT12" SEPARATIONBETWEEN BOTTOM OFCOMBUSTION AIR INTAKEAND BOTTOM OF VENTMAINTAIN 12&

Page 48

V  BEFORE INSTALLING THE BOILERFoundation RequirementsBoiler must be placed on level surface. Boiler is NOT to be installed on carpeting. NOTICEIf bo

Comments to this Manuals